Tech Tip #14
Parallel Current Transformers
for Dual Services
For the Energy Sentry® demand controller to work properly, all power
available to a home must be monitored.
If a home has two load centers each fed separately but from the
same meter the demand controller must receive input from a set of
current transformers in each panel, with the secondaries of the CTs from
each panel in parallel.
The CTs must be installed exactly as outlined below.

Click on the Image for a Closer View
Warnings
All four CTs must be installed in the same direction using the "·"
or "HI" marking on the CT to indicate the polarity of the CT.
The two panels must be checked for phasing so that only the Phase A CTs
of each panel are placed in parallel. Like wise for Phase B.
The same color of wire from each CT must be joined together for the CT
to be in parallel.
|